Contractors in Tualatin, Oregon
Washington County • Population: 28,139
Showing 26 verified contractors
π Roofing in Tualatin
ποΈFencing in Tualatin
π§±Concrete in Tualatin
πͺWindows & Doors in Tualatin
Quick answer
The City of Tualatin Building Division issues building permits through eTrakit, and all electrical permits and plan review are contracted to Washington County. Removing five or more private trees in a calendar year needs a city tree removal permit.
Tualatin issues its own building permits and contracts electrical work to Washington County. Erosion control, right-of-way and floodplain permits come from the city's Engineering Division, with erosion rules based on Clean Water Services standards.
Who issues building permits
The City of Tualatin Building Division takes structural, mechanical, plumbing and other trade permit applications through eTrakit, per its permits page. Review notes, approved plans, issued permits and inspection scheduling all live in the same system. The page lists current turnaround as 0-2 business days for over-the-counter permits and 2-6 weeks for residential.
Electrical is handled elsewhere. "All electrical permits and plan review for the City of Tualatin are contracted to Washington County," the same page says. Our electrical license guide covers what an Oregon electrician needs.
The permits page says to connect with the Planning Division early. Depending on the project you may also need permits from Clean Water Services or Tualatin Valley Fire & Rescue, and new utility connections need a Public Works Permit. Check your contractor in the CCB license search before you sign.
Erosion, right-of-way and floodplain permits
- Erosion control. A city Erosion Control Permit is required when a project is likely to increase soil erosion, under Clean Water Services standards. Single-family permits split at 1,000 square feet of disturbed ground. Wet weather measures must be in place by October 1 and stay through May 31, and exposed soil needs ground cover by October 1.
- Right-of-way. Work in the right-of-way in front of a home needs a Right of Way Permit unless a Public Works or driveway and sidewalk permit covers it. The applicant must confirm the contractor's CCB license and post financial assurance equal to twice the approved construction cost.
- Floodplain. Property in the floodplain needs a Flood Hazard Area Development permit, and rules may apply even to interior-only work. Elevation certificates and other certifications must be prepared by an Oregon-licensed surveyor. Look up your lot on FEMA's Flood Map Service Center first.
Tree removal
Private trees fall under Tualatin Development Code Chapter 33, per the Planning Division's tree removal page:
- You can remove up to four trees in a calendar year without a permit, unless a tree was approved in a site plan or is a designated Heritage Tree.
- Five or more trees in a year, on a site without a site plan approval, needs a tree removal permit.
- Removing trees in a wetland or other sensitive area also needs Clean Water Services approval.
- Street trees are regulated by Public Works, not Planning.
Count trees with your landscaper before the quote. Our landscaping cost guide helps with the budget.
Business license and the Metro license
Anyone conducting business in Tualatin needs a city business license unless state or federal law exempts them, per the city's licensing page. A contractor or landscape contractor located in Tualatin must hold a Tualatin license. The city recognizes the Metro license, so a contractor based outside Tualatin with a valid Metro license does not need one.
Local conditions
NOAA's 1991-2020 normals for Aurora State Airport, south of Tualatin, show 39.55 inches of precipitation a year and 38.7 days with a low at or below freezing. DOGAMI's regional earthquake impact study covers Washington and Clackamas counties and estimates Cascadia earthquake damage by city.
Find contractors in Tualatin
Browse plumbers in Tualatin, Tualatin electricians, heating and cooling contractors, remodeling companies in Tualatin, landscapers and painting contractors. Use our hiring checklist or get quotes.
Sources
- City of Tualatin: Building Permits
- City of Tualatin: Erosion Control Permit
- City of Tualatin: Right of Way Permit
- City of Tualatin: Flood Hazard Area Development and Permit
- City of Tualatin: Tree Removal
- City of Tualatin: Licensing
- Oregon Metro: Regional Contractor's Business License
- NOAA NCEI 1991-2020 Normals: Aurora State Airport, OR (USW00094281)
- DOGAMI Open-File Report O-18-02
- Oregon CCB License Search
Frequently asked questions
Who issues building permits in Tualatin?
The City of Tualatin Building Division issues structural, mechanical, plumbing and other trade permits through its eTrakit online system. The city says all electrical permits and plan review for Tualatin are contracted to Washington County.
How many trees can I remove in Tualatin without a permit?
Up to four in a calendar year, unless a tree was approved as part of a site plan or is a designated Heritage Tree. Five or more needs a tree removal permit, and trees in a wetland need Clean Water Services approval, according to the City of Tualatin Planning Division.
Does my contractor need a Tualatin business license?
A contractor or landscape contractor located in Tualatin must hold a Tualatin business license. The City of Tualatin recognizes the Metro license, so a contractor based outside Tualatin with a valid Metro license does not need one.
Do I need a permit for work in the floodplain in Tualatin?
Yes. The City of Tualatin Engineering Division requires a Flood Hazard Area Development permit for projects in the floodplain, and says rules may apply even to interior-only work. Required certifications must be prepared by an Oregon-licensed surveyor.